EV Charging Time Calculator UK & Ireland
Find the limit. Plan your next charge. All prefilled numbers are illustrative assumptions. Replace them with your own.
Your inputs
How this works
Input power is the smallest of the vehicle AC limit, charger power and optional property limit. Time = energy added ÷ (input power × efficiency / 100). Temperature, battery management, load sharing and tapering can extend charging time. This is an AC estimate, not a DC rapid-charge curve.
Keep the assumptions in view
Use the usable battery capacity and AC rating from your vehicle documentation. Use electricity prices from your current bill. Estimates do not replace an electrical survey or a supplier quote.
Calculations work without JavaScript. To share a scenario, copy the address after calculating. Avoid putting personal information in these fields.